当前位置: 答题翼 > 问答 > 职业技能鉴定 > 正文
目录: 标题| 题干| 答案| 搜索| 相关
问题

The objective of shoring a damaged bulkhead is to ().A.force the warped,bulged,or deformed


The objective of shoring a damaged bulkhead is to ().

A.force the warped,bulged,or deformed sections back into place

B.support and hold the area in the damaged position

C.withstand subsequent additional damage

D.make a watertight seal at the damaged area

请帮忙给出正确答案和分析,谢谢!

参考答案
您可能感兴趣的试题
  • The strong storm did a lot of damage to the coasta

  • The strong storm did a lot of damage to the coasta

  • The dead body of a huge fish has been()on the shore.

  • What is the basic concept of GMDSS?A.Search and rescue authorities shore can be alerted to

  • In ()the time of tidal current varies across the channel from shore to shore.A.inland tida

  • After the big storm the people on the shore anxiously______the lake for any sign of the bo