当前位置: 答题翼 > 问答 > 职业技能鉴定 > 正文
目录: 标题| 题干| 答案| 搜索| 相关
问题

Bridge orders must be _____ and a record of any required changes in speed and direction sh


Bridge orders must be _____ and a record of any required changes in speed and direction should be kept.

A.slowly carried away

B.carried out with a period of delay

C.promptly carried out

D.paid by the captain

请帮忙给出正确答案和分析,谢谢!

参考答案
您可能感兴趣的试题
  • When the order _____ is received from the bridge, the main air stop valve in the starting air line should be shut.

  • The police were given an order that the stolen documents must be recovered at all_________

  • During repair, lubrication lines and orifices must be _____.A.taken awayB.engagedC.connect

  • Care must be taken to condition the ______ in the boiler to prevent scaling, and corrosion

  • The soda-acid portable extinguishers must be discharged and refilled _____.A.every six mon

  • For there ______ successful communication, there must be attentiveness and involvement in