当前位置: 答题翼 > 问答 > 职业技能鉴定 > 正文
目录: 标题| 题干| 答案| 搜索| 相关
问题

In ship construction,a large number of watertight bulkheads results in ()A.increased capac


In ship construction,a large number of watertight bulkheads results in ()

A.increased capacity to set flooding boundaries

B.decreased capacity to set flooding boundaries

C.reduced compartmentation

D.greater deck load capacity

请帮忙给出正确答案和分析,谢谢!

参考答案
您可能感兴趣的试题
  • ● (73) is a method used in Critical Path Methodology for constructing a project schedule n

  • ● (73) is a method used in Critical Path Methodology for constructing a project schedule n

  • How much does Green Construction charge for shipping on orders over $10,000?A.3%B.7%C.10%D

  • Why are the archaeologists interested in dendrochronology?A.They can measure constructions

  • Large sums of money have to ______ each year in painting the steelwork of bridges, ships,

  • is a method used in Critical Path Methodology for constructing a project schedule ne