● The project schedule is more than a document that lays out the activities over time to r


● The project schedule is more than a document that lays out the activities over time to represent the time dimension of the project, it is a management tool to be used for decision making. As such, the schedule is used by the project management team to (73) .

(73)

A. measure, delay, record, distribute, analyze, and direct

B. plan, schedule, monitor, control, report, and forecast

C. promote, highlight, monitor, control, forecast, and report

D. emphasize, visualize, analyze, conceptualize, report, and record

请帮忙给出正确答案和分析,谢谢!

参考答案
您可能感兴趣的试题
  • Developing the project schedule is often an iterative process. It determines the planned s

  • ●Developing the project schedule is often an iterative process. It determines the planned

  • Developing the project schedule is often an iterative process. It determines the planned s

  • ● Project schedule management is made up of six management processes including: activity d

  • ●Developing the project schedule is often an iterative process. It determines the planned

  • The project requires more labor______has been put in because it is extremely difficult.A.w