● Integration(73)is the process of verifying that the components of a system work together


● Integration(73)is the process of verifying that the components of a system work together as described in the program design and system design specifications.

(73)A. trying B. checking C. testing D. coding

请帮忙给出正确答案和分析,谢谢!

参考答案