当前位置: 答题翼 > 问答 > 计算机类考试 > 正文
目录: 标题| 题干| 答案| 搜索| 相关
问题

An administrator has an existing HMC and POWER6 570 connected to a network switch. The adm


An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC.Which infrastructure is required for the new HMC?()

A.An additional switch for the new HMC

B.Asynchronous adapters on the new HMC

C.The two 570 servers are directly connected to the new HMC

D.One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC

参考答案
您可能感兴趣的试题
  • Q:What leadership qualities did you develop as an administrative personnel?(作为行政人员,

  • Q:What leadership qualities did you develop as an administrative personnel?(作为行政人员,

  • 阅读:Is it possible to persuade mankind to livewithout war? War is an ancient institution which has existed for atleast sixthousand years

  • An administrator issued a command to update thefirmware of an Ethernet adapter on a partitioned system but received an error.What is the most likely cause of the problem?()

  • While configuring a new adapter using cfgmgr an administrator receives a warning message

  • An administrator is supporting an AIX 6.1 LPAR remotely and needs a tape operator to plug